Texas project signal sample

Review Permian pipeline construction notices.

Review 10 records on this page. Submit one form to download the PDF and 10-record CSV with reported timing, asset details, counties, source identifiers, T-4 numbers where present, and direct verification links.

10
pipeline notices in this sample
8
selected Permian counties
89.59
reported notice miles

Reviewed 2026-09-05. Source file: 2026-08-24. Reported starts from 2026-09-05 through 2026-12-04. These are selected source records, not new September filings.

Get the PDF and CSV

Name, work email, and company are required. One submission unlocks the four-page PDF and the 10-record, 21-field CSV.

We may follow up about this report. No bulk email. Public records still require source verification.

Source-dated rows

Reported timing stays attached to the source identifier and public verification path.

10-row preview and 10-record CSV

Review the records on this page, then submit one form for both the PDF and CSV.

Caveats included

A signal starts qualification; it is not presented as proof of active work or an open award.

Public 10-row preview

Project, timing, scope, location, and source.

Reviewed 2026-09-05; source file 2026-08-24. Counties: Glasscock, Loving, Midland, Pecos, Reagan, Reeves, Upton, Ward.

Pipeline#1 | 2026-09-07 | Reported start date

BUFFALO RUN PIPELINE LLC

LGD-C BLENDING TO PEMBROOK

Reported scope
36-inch natural gas transmission; 30.03 reported miles
Location
Glasscock, Midland, Reagan, Upton, TX
PS-48 NOTIF-010741; filing 26-NC-059; T-4 10343
Pipeline#10 | 2026-12-01 | Reported start date

BRAZOS MIDLAND GAS, LLC

ROWDY GATHERING LINE (TRIPLE CROWN AREA)

Reported scope
24-inch natural gas gathering; 9.12 reported miles
Location
Glasscock, Midland, TX
PS-48 NOTIF-011240; filing 26-NC-142; T-4 10517

Qualification boundary

A signal is a reason to verify, not a promise of work.

Reviewed September 5, 2026 using the RRC file dated August 24, 2026. These are selected records from that file, not ten new September filings.
Includes every notice in this source with a reported start from September 5 through December 4 and at least one of the eight selected counties. This is not complete Permian construction coverage.
Reported starts and mileage do not establish present construction, procurement, completion, an open bid or an award. Confirm current project status before outreach.
Mileage is the sum of full notice scopes, not surveyed route miles. T-4 numbers identify systems; a shared number does not establish an exact construction route.
Three selected rows contain raw T-4 value 12345, flagged unusable by the accepted parser. The CSV preserves the raw value and status; do not use it as a verified permit.

Move from a dated sample to a current watchlist.

Premium and scoped signal delivery add current rows, maps, linked records, filters, exports, alerts, and a repeatable review workflow.

Frequently asked questions

Does a PS-48 notice prove construction is active?

No. It reports construction-start information from the public source. It does not by itself prove current construction status, completion, procurement, or award.

How were these notices selected?

This sample includes all ten notices in the August 24 source with a reported start from September 5 through December 4, 2026 and at least one of Glasscock, Loving, Midland, Pecos, Reagan, Reeves, Upton or Ward counties. It is not complete Permian construction coverage.

What is included in the requested CSV?

The requested file contains 10 records and 21 factual fields covering timing, account, project, asset type, reported size, county, source identifiers, T-4 where present, source dates, and verification links.

What does the paid workflow add?

Premium and scoped delivery add current watchlists, maps, linked records, filters, exports, alerts, and repeatable source-aware research paths.