Texas midstream signal report

Texas PS-48 Pipeline Construction Signal Report

PS-48 construction notices, T-4 permit context, operators, counties, mileage, product type, timing windows, and route-system follow-up organized into a project review list.

PS-48 source rows
144

June 25, 2026 source review

Reported miles
1,348.4

source-reported mileage, not route verification

Rows with T-4 numbers
85

route/system handle for follow-up

Starts inside 90 days
30

timing window, not field-status proof

What this report answers

Which Texas PS-48 construction-notice rows show operator, county, product, mileage, timing-window, and T-4 context worth checking next?

Source clock

PS-48 source review dated June 25, 2026; source rows should be refreshed before sales or field follow-up.

Built for

Midstream business development
SCADA and measurement companies
Fabrication and construction-support teams
ROW, survey, civil, compression, meter, automation, and field-service providers

Source layers

Texas PS-48 construction-notice rows
T-4 permit numbers where available
Operator, county, product, mileage, diameter, and timing fields
Route/system, interconnect, facility, and current-status follow-up checks

Sample rows

Selected records from the report workflow.

These examples show the format and evidence discipline. The current report includes the working table, CSV fields, and source-date context.

RecordEnergy Transfer Company / Hugh Brinson 42in
Signal325.0 miles; natural gas transmission
SourcePS-48 construction-notice row
Next checkT-4, route, interconnect, compression, meter, and current-status evidence
RecordWWM Operating / DBR Expansion
Signal53.5 miles; natural gas transmission
SourcePS-48 row with near-term timing and T-4 context
Next checkRoute/system record, county spread, and related facility evidence
RecordBrazos Midland Gas / Sundance To Butler HP 24-In
Signal46.0 miles; natural gas gathering
SourcePS-48 row across Martin and Midland
Next checkOperator, county, upstream activity, route, and facility context

Fields included in the report / CSV

The public page shows selected rows. The requested report and CSV include the sortable fields needed for account, county, project, source-date, and follow-up review.

OperatorProject or line nameCountyProduct typeReported mileageDiameterTiming windowT-4 number when availableSource dateNext checkCaveat

What the source supports

A construction-notice review order by operator, county, product type, mileage, diameter, timing window, and T-4 status.

A companion CSV for teams that need to sort, filter, and assign follow-up records.

A source-aware app workflow for maps, saved lists, exports, alerts, and API-ready fields where available.

What the source does not prove

Contract award, project spend, vendor need, field progress, in-service status, or final route geometry.

That every stated start date is still current without a later source-status check.

That a short lateral and a multi-county transmission row should be pursued the same way.

Report package

Ranked project-signal report
Companion CSV export
Operator and county rollups
Timing-window and T-4 status filters
App workspace review path

Request current rows

Request the current Texas pipeline construction signal report.

Tell us the buyer segment, territory, and export format you need. We will scope the current report, companion CSV, app workspace, and any API/custom delivery path.

Request report