A current, source-backed register of verified company projects, federal named projects, Texas pipeline construction notices, and Texas facility activity. New Mexico permit and spud activity remains supporting context and is not counted as midstream project rows.

All qualified records
121

Every row meeting the published boundary; no editorial cap

Named projects
2

One verified company project and one federal named project

Pipeline construction
92

710.29 source-reported miles inside the pipeline horizon

Facility activity
27

Source-dated facility events in the prior 90 days

What this report answers

Which named midstream projects, pipeline construction notices, and facility events meet the published source and timing boundaries today?

Source clock

Production report generated August 22, 2026. Company and FAST-41 source layers were captured August 21; TCEQ August 19; T-4 August 18; PS-48 July 24. Each source keeps its own clock.

Published qualification boundaries

What enters the current register.

Named major projects
Recent material event or documented active delivery horizon
Verified company announcement or federal project/docket evidence; construction and permit status are not inferred.
Pipeline construction
May 24 through November 20, 2026
Reported start, recent material event, or documented multi-year interval overlapping the +/-90-day horizon.
Facility activity
May 24 through August 22, 2026
Source-dated material event with operator, asset, location, and stable identifier.
Supporting activity
State-anchored permit windows and trailing 180-day reported spuds
Analytical context only; NM APDs and spuds are not counted as pipeline or facility projects.

Built for

Midstream business development
SCADA and measurement companies
Fabrication and construction-support teams
ROW, survey, civil, compression, meter, automation, and field-service providers

Source layers

Texas PS-48 construction-notice rows
T-4 permit numbers where available
Operator, county, product, mileage, diameter, and timing fields
Verified company project announcements and disclosed delivery horizons
Federal FAST-41 and FERC project evidence
Texas TCEQ compressor, tank, separator, and related facility events
New Mexico permit and reported-spud supporting context

Sample rows

Selected records from the report workflow.

These examples show the format and evidence discipline. The current report includes the working table, CSV fields, and source-date context.

RecordSolitude Pipeline System
SignalTwo 48-inch pipelines; Permian Basin to Katy; 4.5 Bcf/d planned in two phases
SourceAug. 17 verified company announcementsDevon Energy announcementWestern Midstream announcement
InterpretationApproved to proceed; construction is not confirmed and customary approvals remain pending.
RecordTexas Gateway
Signal155 miles of 36- and 42-inch pipeline plus new and modified compressor facilities
SourceFAST-41 project record and FERC docket evidenceFAST-41 project pageBoardwalk project pageFERC docket filing
InterpretationFederal permitting evidence identifies scope and docket handles; it does not confirm current construction.
RecordTexas PS-48 construction notices
SignalEvery row with a reported start inside the published +/-90-day pipeline horizon
SourceTexas RRC PS-48
InterpretationT-4 is labeled as a number or match pending. A notice is not proof of current field progress.
RecordTexas facility activity
SignalCompressor, tank, separator, and related source-dated facility events
SourceTexas TCEQ
InterpretationA permit event does not independently confirm construction, operation, completion, or vendor selection.

Fields included in the report / CSV

The public page shows selected rows. The requested report and CSV include the sortable fields needed for account, county, project, source-date, and follow-up review.

OperatorProject or line nameCountyProduct typeReported mileageDiameterTiming windowT-4 number when availableSource dateConstruction and approval status when source-supportedCapacity and phase timing when disclosedPrimary-source and docket linksCaveat

What the source supports

A complete qualified register separated into four evidence classes, with no score and no editorial row cap.

A companion CSV for teams that need to sort, filter, and assign follow-up records.

A source-aware app workflow for maps, saved lists, exports, alerts, and API-ready fields where available.

What the source does not prove

Contract award, project spend, vendor need, field progress, in-service status, or final route geometry.

That every stated start date is still current without a later source-status check.

That a company project decision is a PS-48 or T-4 filing, or that a permit notice confirms current field work.

Report package

Current source-backed project-signal report
Companion CSV export
Searchable complete in-app register
Published timing and evidence boundaries
Named-project source links and status fields

Request current rows

Open the current report in the app.

Tell us the buyer segment, territory, and export format you need. We will scope the current report, companion CSV, app workspace, and any API/custom delivery path.